During the construction of the new addition we will be periodically adding new pictures to this page to keep everyone informed of the progress thus far.

The removal of the original candyroom and storage room

Monday, October 20, 2014

Jampot closed on Saturday the 18th of October. The following Monday we began removing the candy room, a small storage room, a section of the kitchen and the loading dock. Doing this cleared the site and allowed us to begin the construction of the new addition by laying the foundation.

The Foundation of the addition being poured

Wednesday, October 29, 2014

Nine days after the necessary demolition the foundation had been laid and we poured and screeded the concrete ground floor.

A view from the road of Jampot including the new addition

Friday, November 14, 2014

A couple of weeks later we had framed in the first floor and raised the walls on the second floor. This picture gives a view of the addition in relation to the existing Jampot building.

A view of the second floor from above before the roof is completed

Friday, November 14, 2014

By the middle of November the snow had begun to fall and we hurried to get the roof on before the snow filled in the second floor.

The final truss being raised into place

Friday, November 14, 2014

By the end of the day the trusses were in place and we were ready to begin the roof.

The roof of the addition nearing completion

Thursday November 20, 2014

By the following week the roof was almost finished and the building mostly closed in.

The exterior shell of the building is finished

Friday, December 19, 2014

With the roof completed we are now able to begin installing plumbing, electrical, and heating and air conditioning.

The utility room before the drywall is installed

Tuesday, December 30, 2014

This view shows the utility room which will house most of the compressors, boilers, and various electrical machinery. The addition required an extensive network of electrical wires, hot and cold water lines, gas lines, and even compressed air for some of the equipment.

Jampot Kitchen wall removal

Saturday, January 10, 2015

In order to connect the addition to the original building, we removed most of the old south wall of the existing kitchen and expanded the kitchen by two feet. The doorframe on the left side of the photograph has since been removed as well.

The Candy Kitchen with drywall hung

Saturday, January 10, 2015

This photograph is of the new candy kitchen. The drywall has been hung and the taping and mudding process is ready to begin.

The utility room before the drywall is installed

Saturday, January 10, 2015

As the drywall taping process was being done inside, we also began siding the exterior of the addition.

The Candy Kitchen waiting for drywall sanding and finishing

Wednesday, January 14, 2015

In this photograph the taping has been done and the room now awaits the beading of the windows, as well as the finishing and sanding.

The utility room drywall being taped

Wednesday, January 14, 2015

This photograph shows the taping of the utility room in process.

Removing excess drywall compound

Wednesday, January 14, 2015

The excess drywall compound is being removed from the tape with a pallet knife in this photograph.

Beginning the siding of the building

Thursday, January 15, 2015

We are now beginning the siding of the exterior of the building.

Finishing the ceiling

Thursday, January 15, 2015

Finishing the upper corner of the ceiling.

Siding partially completed

Tuesday, January 20, 2015

The siding is now partially completed.